Technical parameters in this guide are project-specific and have not yet been confirmed by specialist review. Confirm materials, structure, lighting and electrical details with our engineering team before specifying.
What this guide answers
How do you divide the work between the metal fabricator, lighting supplier and site electrical team?
Key takeaways
- Name the responsible party for the metal body, lamps, drivers, controls, wiring and installation. Include the approval and commissioning tasks in that responsibility list.
- Coordinate physical interfaces before fabrication: mounting locations, cable entry, equipment space and access openings belong in the shared drawings.
- Review the combined sample and final interface details together. Record changes so the metal and electrical packages use the same approved information.
When to choose what
Lighting equipment is supplied by another contractor
Confirm the equipment dimensions and mounting requirements before the metal body is finalized.
A coordinated package is requested
List exactly which equipment, interfaces, testing and site tasks are included in the supplier scope.
From our factory
Illustrative coordination: the lighting supplier provides the driver dimensions, and the fabricator develops the access panel around them. Both teams review the cable path and removal clearance before the base detail is approved.
Checklist
- Responsibility list for each component and site task
- Lighting equipment information
- Cable routes and equipment access
- Coordinated drawing revision
- Sample, inspection and commissioning scope
Related products & services
Illuminated Metal Sculptures
Full Details → →
Metal & Lighting Integration
Full Details → →Discuss your project
Full Details → →More guides on this topic
Planning a lit metal piece?
Send your lighting reference and metal design — we define the interface, produce a lit sample and coordinate with your lighting partner.
Discuss your project