Technical parameters in this guide are project-specific and have not yet been confirmed by specialist review. Confirm materials, structure, lighting and electrical details with our engineering team before specifying.
What this guide answers
What delivery and installation decisions belong in the sculpture design stage?
Key takeaways
- Review the overall size against the proposed transport route and handling equipment. Identify any sectioning requirements before the form is released for production.
- Coordinate joints, alignment, lifting and base fixing with the site team. The delivery method needs to work with the installation space and sequence.
- Define packing, labeling, inspection and unloading responsibilities. Use a component list and assembly information to connect the shipment with the site work.
When to choose what
The complete piece can be transported and handled
Confirm the crate, route and site lifting requirements before deciding to ship it as one unit.
The form needs to be divided
Review section positions, visible joints and alignment details alongside the packing and site-assembly plan.
From our factory
Illustrative delivery plan: a large animal sculpture needs to pass through a restricted entrance. Review the available route with the site team before selecting a shipping arrangement or deciding where sections will join.
Checklist
- Transport and site access dimensions
- Component sizes and packing plan
- Handling and lifting requirements
- Base and assembly interfaces
- Delivery, unloading and installation responsibilities
Related products & services
Large Metal Sculptures
Full Details → →
Public Art & Sculpture Fabrication
Full Details → →Discuss your project
Full Details → →Shipping a large sculpture?
Send your sculpture dimensions and destination — we design the sectioning, crating and on-site assembly plan before fabrication starts.
Discuss your project