Procurement & RFQ Oct 19, 2026 3 min read

Planning a Custom Metalwork Schedule

Map the drawing, sample, fabrication, inspection and logistics stages, with clear approval points before each production commitment.

Technical parameters in this guide are project-specific and have not yet been confirmed by specialist review. Confirm materials, structure, lighting and electrical details with our engineering team before specifying.

What this guide answers

How do you build a useful schedule for a custom metalwork order?

Key takeaways

  1. Break the programme into drawing review, samples, procurement, fabrication, finishing, inspection and logistics. Each stage needs an owner and a defined input.
  2. Place approval milestones before the work that depends on them. Model changes, finish decisions and interface revisions should be reflected in the current programme.
  3. Agree the quotation assumptions and the date on which production information becomes complete. Recheck the schedule when scope or site conditions change.

When to choose what

The deadline is fixed but design decisions remain open

Identify the unresolved drawings, samples and interfaces, then agree which decisions are needed first.

The design and samples are approved

Confirm procurement, factory work, inspection, packing and delivery dates against the agreed scope.

From our factory

Model development before fabrication
Model development before fabrication
Installed infinity-loop sculpture
Installed infinity-loop sculpture
Anonymized example

Illustrative programme: set a finish-approval milestone before the finishing slot and a dimensional review before packing. If the model changes, update the affected tasks before confirming the delivery commitment.

Checklist